Analysis and Research on the Surrounding Rock Stability of Deep and Large Working Shaft of Long Shaft Deep Well Pump
Vol 2, Issue 1, 2022
VIEWS - 258 (Abstract)
Download PDF
Abstract
The design of deep and large shaft excavation and support is not only related to the safety of personnel and machinery during construction, but also directly affects the safe and stable operation of the long-axis deep well pumping pump station in the later period. Therefore, the design of the surrounding rock support of the working shaft is very important. This paper makes full use of the advantages of Midas GTS NX geotechnical finite element analysis software and FLAC3D finite element analysis software to analyze and calculate the primary and secondary support of deep and large working shafts, verifies the rationality of the primary support measures, and provides specific design parameters for the secondary support design, which has a good practical guiding significance for the actual engineering design.
Keywords
References
Zhou Xionghua, Xu Shengxiang, Leng Xiqiao. Analysis of Surrounding Rock and Structural Mechanics Characteristics of Deep Vertical Shaft Construction Method [J]. Modern Tunnel Technology (Supplement 2), 2019, 56 (S2): 325-331.
Leng Xiqiao, Yan Jinxiu, Han Yuxuan. Exploration of Design and Construction Methods for Deep and Large Vertical Shafts in Highway Tunnels [J]. Highway, 2019 (08): 221-225.
Xian Mingqi. An excavation of a 450m deep vertical shaft at a height of 1790m: ventilation shaft of Anfang Tunnel on General National Highway 158 [J]. Tunnel and Underground Engineering, 1999 (2): 48-55.
Lü Kangcheng, Yang Rongshang, Li Gaowang, et al. Discussion on the Design and Construction of Ventilation Shafts for Extra Long Tunnels in Aid to Highways [J], 2007 (4): 211-217.
Chen Zhang, Chen Guangming, Cheng Jiusheng, et al. Design of inclined and vertical shafts of Longtan Tunnel [J]. Highway, 2005 (8): 170-175.
Zhao Shengli. Research on Construction Technology of Vertical Shafts in Highway Tunnels [D]. Beijing: China University of Geosciences (Beijing), 2005.
Li Yi. Construction method for vertical shaft of Yunzhongshan Tunnel [J] Shanxi Architecture, 2012 (15): 201-202.
Dai Xin, Xu Wei, Zou Li, Shen Qingfeng, etc Numerical simulation analysis of vertical shaft excavation process [J] Journal of Geotechnical Engineering, 2012 (SI): 154-157.
Yao Yahui, Zhang Yujie, Wan Long, Yu Xubing, etc. FLAC~(3D) numerical simulation of vertical shaft excavation process [J] Metal Mines, 2014 (05): 60-63.
Zhou Zheng'an Wellbore rupture and seepage deformation in the Huaibei region [J] Anwei Geology, 1993 (1): 59-67.
Refbacks
- There are currently no refbacks.
Copyright (c) 2024 WANG Jun, YAN Shang long
This work is licensed under a Creative Commons Attribution-NonCommercial 4.0 International License.
ISSN
2810-918X (Online)